The Department of Urban Roads in collaboration with Mustek Engineering Limited constructed adequate drainage structures to comprehensively mitigate discharge and flooding problems plaguing of the Adentan community, as well as the road development of the access network to bituminous surfacing level. There was critical cross-drainage structures and also required roadside drains.