REHABILITATION OF OLD FADAMA ROAD

The Urban Roads Department constructed all the drainage structures and full rehabilitation works for the entire local road network within the Old Fadama Enclave.The Rehabilitation of the Old Fadama Area comprises of the local access network within the Fadama area, which total approximately 5.20km

This was done to provide a suitable accessibility within the community towards the provision of alternative routes within and around the enclave.and the elimination and reduction of congestion scenarios within the locality and the immediately affected adjoining arterial and collector network, so it can improved traffic flow for commuter traffic.

Leave a Reply

Your email address will not be published. Required fields are marked *